I have used before this function having a follow up material with indicator 1 and effective-out date. However, this time I have 3 materials A, B, C.
The logic I want to use is the following but I'm not sure if SAP supports this:
A = discontinue material and B = Follow-up material. Using indicator 1
B = discontinue material and C = Follow -up material. Using indicator 1.
So far, SAP is not allowing me to have B as discontinue and follow-up material at the same time. Any insights?
Thanks for your help.