Hi All,
Thanks for reply. However i think i havent posted the question properly
1. can all extraction jobs (MCNB,OLI1BW,OLIZBW) can run parellely in ECC system.
I agree the BX has to be loaded first in BW. But my question is on ECC.
I would like to reduce the down time for the business
2. Can i do the init without data transfer for 2lis_03_bf, 2lis_03_um so as to make
downtime only for 2lis_03_BX .then i will fill the setup tables
Thanks