Hi all ;
ATP is carry out based on material availability date which is performed with the schedule line category in the sales document (VOV6) and the check group in the material master for organizational level plant.
You can change date manually when you create sales order in schedule lines. However , material is entered in the sales order is not available , availability control screen is displayed. This is second way.
Regards.
M.Ozgur Unal