Hi,
I have issue with avaliability check in productin order (main product with co-product). I have planned order. When I convert this planned order, system showing message missing avaliability:
Missing part list is below:
Even so, I convert planned order to production order. When I check availability check in this production order, system showing message: All checked materials in order are available, but trere are missing component in component overview.
Howis this possible?
Thanks
Lukas