Thanks Venkat.
T510S has been configured like this :
Time wage type for planned work :
Conditions time:
Start End Min Max Rel. Process.type
07:00 24:00 0.00 10:00 S
check Exit rule
check stop time wage type selection.
Please suggest if this configuration will address the below business scenario:
This specific wage type should be generated for the first 10 hours of the ee's working time. As per the DWS, 10 hours is the max time the TE driver will consider for evaluation. There is no overtime processing and hence all the working time should be processed as planned work.
Rgds
Neetu A