Re: Components inspection at the picking and before consumption

$
0
0

Hi Arijit,

 

Thanks for your contribution

 

Lets take an example in a discrete manufacturing environment with sub assembly prod order.

 

FERT = HALB1

          + RAW1

          + RAW 2

          + HALB2

 

 

RAW1 and 2 have been purchased from outside and inspection type "01" is applied for them, then we performed inspection for good receipt. This is out of my concern scope.

 

All the components being stored during a long time, we have to make sure to use the good components for manufacturing purpose. That's why we perform components inspection. But we have to do this before consuming them (mvt 261) on the prod order. That's why we cannot use Inspection type "02" because  in that case the inspection lot creation is triggered by goods consumption.

 

I think the only solution will be may be to use inspection type "08". I will transfer the components in QI by 322 mvt code. This will trigger inspection lots for visual inspection. I'll perform UD to send them in Unrestrcted use. But the only problem would the missing link with my prod order.

 

What do you think ?