Hi Frédéric,
I will get back to you regarding that SP25 thing, I will recheck the note I have read..
Thank you for the info with that SP19 level..
So based on your reply, are you also recommending the DMO process as the solution for migration to HANA? So we only need to upgrade to SP19 then do the DMO..Is that right? No other way where there is no upgrading of SP level?
EDIT:
I stand corrected, yes it's SP19..However, based on these PPTs, there are certain SP level needed to implement some notes for cleaning up the BW system, reducing the size, pre and post migrations tasks, etc. So does it really mean we need to upgrade first our current BW system before migrating to HANA? Is my understanding correct?
http://www.comerit.com/UserFiles/Downloads/HANA2014_A_to_Z_Guide_Part_1.pptx
http://csc-studentweb.lr.edu/swp/Berg/articles/BI_2014_HANA_2014/HANA2014_A_to_Z_Guide_Part_2.pptx
Regards,
Loed
Message was edited by: Loed Despuig