hi sir,
i have a doubt, for example i have 4 notification for which i have created only one order, the 4 notifications consists 4 different equipment's on which maintenance has been done whose maintenance cost is 10000, i.e for each equipment, cost of maintenance is 2500 & in the order work for one equipment is assigned but the order is attached for all the notifications, so will the system calculate cost as 10000 or cost as 2500.