Hi
i'd like to know the expected system behavior in determining the quota selection rule group if the configuration was misleading as the following case
the ESG for quota type is 8
the PS Grp for quota type 09
there are 2 different quota type selection rule groups defined for the ESG and PS Grp 77 and 78
the feature QUOMO is defined; so that quota type selection rule group 78 is selected.
a custom time evaluation schema is used, and function MOD is used with custom PCR that uses operation MODIF to set quota type selection rule group "MODIF Q=92".
quota type selection rule group 92 doesn't have an entry for ESG 8 and PS Grp 09 in Table T559L
current behavior is quota type selection rule group 77 is set!
is it the expected system behavior?