Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 9091

Re: 2013 Crystalras.exe: How to create a cluster?

$
0
0

"how I can create a cluster with multiple RAS servers on the same physical server?" The CrystalReports2013ReportApplicationServer is a multi-thread application, and there is no need to clone this same server on the same physical server. If the jobs for RAS is more than your current setup, you could set the "Maximum Concurrent Report Jobs (0 for unlimited)" to 0 and let CrystalReports2013ReportApplicationServer to determine how many jobs it can accommodate at run time given the HW resources, e.g. CPU and RAM, and setup another matching CrystalReports2013 on a separate physical server for clustering to share the RAS load if one CrystalReports2013ReportApplicationServer is not enough to meet your business demand. Hope this helps, Jin-Chong


Viewing all articles
Browse latest Browse all 9091

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>